Lhotzky and Partner: Separation of concrete and reinforcing steel

Lhotzky und Partner Projektmanagement

Demolition of an underground car park: planning, safety, waste disposal

Lhotzky and Partners planned and coordinated the work for the design of a safety concept, a pollutant register and a disposal concept. Furthermore the company was tasked with the creation of a work- and safety-plan and the specifications for tenders for the demolition of an underground car park in Hamburg.

Challenges with the demolition

Specifics of this mission

  • There is a contamination by petroleum-derived hydrocarbons.
  • At the execution an access for fire fighters has to be kept clear.
  • Furthermore a couple of endangered deserving trees at the site had to be left undamaged.

We design a comprehensive project concept, that takes into account all frame conditions. At the end detailed tender documents come out.

Gallery

Previous Previous Previous Next Next Next
12345
Lhotzky and Partner: Demolition of the underground car park ceiling Open image in lightbox: Lhotzky and Partner Open image in lightbox: Lhotzky and Partner
Lhotzky and Partner: Demolition of the car parks floor and backfilling of the pit Open image in lightbox: Lhotzky and Partner Open image in lightbox: Lhotzky and Partner
Lhotzky and Partner: Temporary support oft he vertical car park walls Open image in lightbox: Lhotzky and Partner Open image in lightbox: Lhotzky and Partner
Lhotzky and Partner: Separation of concrete and reinforcing steel Open image in lightbox: Lhotzky and Partner Open image in lightbox: Lhotzky and Partner
Lhotzky and Partner: Gradual backfilling of the pit with filling sand Open image in lightbox: Lhotzky and Partner Open image in lightbox: Lhotzky and Partner

Execution, demolition underground car park

On site we observe the progress of work by the hired contractor. The demolition proceeds as planned. At first the roof and the floor of the car park were consecutively prised open and removed as planned. Parallelly concrete and steel reinforcement were separated according to the rules. Afterwards the demolition contractor filled the cavern with sand. Well visible on the photo: The temporary stabilization of the upcoming car park walls.

Search Search

NEW

  • Lhotzky and Partners with measuring system at MidGT
  • Lhotzky-Team at dump symposium
  • Groundwater remediation at a petrol station site
  • Remediation of remains by air sparging
  • Remediation of a petrol station under pressure of time

TOPICS

  • All
  • News
  • Projectmanagement
  • Geostructural monitoring
  • Environmental engineering
  • Date

COMPANY

Lhotzky und Partner Ingenieurgesellschaft mbH
Pillmannstraße 29a
38112 Braunschweig
Germany

CONTACT

Mail office@lhotzky-partner.de
Tel. +49 531 ­23 77 94-0
Fax +49 531 ­23 77 94-81

LEGAL NOTICE

  • Imprint
  • Privacy Policy
Scroll to top Scroll to top Scroll to top